Search results

947 Results Found

Updated 7/9/2021 The Williston Vector Control District will be conducting adulticide treatments this week between July 8th and July 11th as follows: July 8: Ground - Grenora & Ray July 9: Ground - Williston Blocks 1 – 6 July 9: Aerial - Williston Blocks 8 - 10 All treatments will take place near sunset, weather...

The North Dakota Fire Danger Rating is a broad scale assessment that is issued each morning at approximately 6:45 CST during fire season by the U.S. Forest Service (USFS). The fire season is typically from April 1st to October 31st. The USFS calculates the Fire Danger Rating using grassland fuel moisture, forecast temperature, humidity, wind...

Updated 7/3 @ 1 pm Mosquito populations across Williams County have been steadily increasing over the past few weeks with the rain we’ve been receiving. The Williston Vector Control District will be conducting aerial and ground adulticide treatments this week between June 29th and July 5th. At this time, the following treatments have been scheduled:...

UPDATE 6/25/2021 @ 2 pm: The Williston Vector Control District will proceed with conducting an aerial adulticide treatment tonight in Williston for Spray Blocks 1 - 7 and 12. Weather permitting, the treatment will occur near sunset.   The Williston Vector Control District will be conducting aerial adulticide treatments on Thursday, June 24th or Friday,...

FOR IMMEDIATE RELEASE   June 22, 2021 For more information, contact: Lindsey Harriman Williams County Communications Department Phone: 701-577-4557 (office) lindseyh@co.williams.nd.us    Williams County Planning and Zoning Commission to finalize recommendation regarding WISCO application to accept TENORM waste   Williston, N.D., (June 22, 2021) – The Williams County Planning and Zoning Commission will hold a Special...

Volunteers must possess a valid  driver’s license and have no felony convictions.  It is imperative that all volunteers representing Williams County EM be of sound character and have high moral values. Background check and drug and alcohol testing may be required.  

Effective at 9 am, Rainbow Township has closed 121st Ave NW from 75th St NW (CR 12) north 2 miles to 77th St NW until further notice for road repairs. Map of area

Position Name Phone Supervisor Chairman Ben Eaton 701-570-9386 Supervisor Pat Schmaltz 701-541-1033 Supervisor Ron Hanson 701-570-5334 Clerk - Treasurer Kim Schmaltz 701-793-8901  

Position Name Phone 1 Supervisor CH Jim Horob 701-770-6677 Supervisor Allen Sutton 701-774-7973 Supervisor Chad Austreim 701-875-4108 701-570-3691 Supervisor Ronald Miller 701-875-4212 701-713-0847 Clerk - Treasurer Warren Sundet 701-609-0802  

Beginning Monday, 6/21/21, Beginning Monday, June 21st, Williams County Highway will be doing bridge construction on County Road 10 (69th St NW), the road leading to Blacktail Dam. The construction area includes the bridge located right before the turn that goes north into Blacktail Dam (141st Ave NW). This portion of County Road 10 will...

Effective 6/15/2021 at 7:40 am, Strandahl Township has lifted the NO OVERWEIGHT restriction on their Township roads. Roads will now return to the regular restriction by legal weight (105,500 lbs), unless otherwise marked.

Effective 6/14/2021 at 3:15 pm, the powerlines have been repaired on 70th St NW in Golden Valley Township and the 2 miles between 112th Ave NW east to 110th Ave NW (CR 19) are now open for travel.

Update 6/14 @ 3:15 pm: The powerlines have been repaired on 70th St NW in Golden Valley Township and the 2 miles between 112th Ave NW east to 110th Ave NW (CR 19) are now open for travel. --Original post below-- 70th ST NW in Golden Valley Township will be CLOSED from 112th Ave NW...

Effective 6/15/2021 at 7:40 am, Strandahl Township has lifted the NO OVERWEIGHT restriction on their Township roads. Roads will now return to the regular restriction by legal weight (105,500 lbs), unless otherwise marked. --Original post below-- Effective at 8:05 am on 6/11/2021, Strandahl Township has restricted their township roads to NO OVERWEIGHT travel until further...

Effective at 5 pm, CR 6 (58the St NW) that was crossing the Epping/Springbrook bridge has been re-opened. Please travel with care as construction is still ongoing and there are workers in the area.

Close window